Extra long leading ropes

Jessey

Well-Known Member
Dec 20, 2004
24,822
15,240
113
41
Suffolk, UK
I personally don’t like most of the NH type ropes because they’re braided nylon, which will give you a rope burn fast if things get sticky and I find 14ft too long on the trail.

I have had 3m (10ft) long jumbo cotton ropes for about the last 20 years, they’re long enough for most stuff (regular lead ropes are 2m/6ft).

For long rides I don’t carry a lead rope (it’s just unnecessary weight to carry and every gram counts), I just have my reins fitted to scissor clips so I can use those, both my continental English ones and my western split ones.
 
Last edited:
  • Like
Reactions: carthorse

carthorse

Super Moderator
Staff member
Jan 6, 2006
9,706
5,640
113
To be honest I've just joined two normal cotton lead ropes together. Get two that have the clips looped on, unloop the clip off one (keep the clip, they're handy), slightly untwist the non-clip end of the other rope and put the end where you took the clip off through then thread the rope back on itself and pull tight - you now have a double length rope :) You could just clip one rope onto the end of the other, but I prefer not to have a clip in the middle as it adds weight and there's always the chance of it catching a horse.
 
  • Like
Reactions: Jessey

Skib

Well-Known Member
Dec 21, 2003
8,569
1,871
113
London
Funny, I dont have a 10ft. None of mine are plastic. I went to a clinic once at which ropes were explained. Certainly no joining but we were invited to feel what the horse feels via various 6 ft ropes., And the difference between metal clips and tying on.

I have 6 ft twisted cotton, 12 and 14. The 12 with clip and 14 with no clip are what I call braided (dont know the technical word).

I used the 12 ft for grazing the old mare in hand. The 14ft is still white and pristine with no clip, a Branaman souvenir from a store in the USA, I would have used it when the yard switched to rope halters, but by then the mare was gone.
 

Jane&Ziggy

Jane&Sid these days!
Apr 30, 2010
19,269
7,236
113
61
Surrey Hills
I personally don’t like most of the NH type ropes because they’re braided nylon, which will give you a rope burn fast if things get sticky and I find 14ft too long on the trail.

I have had 3m (10ft) long jumbo cotton ropes for about the last 20 years, they’re long enough for most stuff (regular lead ropes are 2m/6ft).

For long rides I don’t carry a lead rope (it’s just unnecessary weight to carry and every gram counts), I just have my reins fitted to scissor clips so I can use those, both my continental English ones and my western split ones.
I agree, I don't like nylon. All of mine are cotton, or something natural feeling and soft anyway.
 
  • Like
Reactions: Jessey

Skib

Well-Known Member
Dec 21, 2003
8,569
1,871
113
London
I dont know if I would get rope burn, I was taught only ever to lead wearing gloves. But I do like my ropes. One gets used to the things one uses. My hands are small and the finer (thinner) long rope I have suits me well.
At my current yard, they are off cotton anyway because ropes and head collars (leather) are left at the field all night and in all weathers.
 

carthorse

Super Moderator
Staff member
Jan 6, 2006
9,706
5,640
113
I’ve had rope burns when the rope has gone right through the glove, it’s no guarantee.

Same here Jess, I ruined a pair of gloves with a heavy leather palm trying, and ultimately failing, to keep hold of Jim when he was a youngster.
 
  • Like
Reactions: Jessey
Similar threads
Thread starter Title Forum Replies Date
BIrish Extra noisy gut sounds - bit long sorry.. Horse Care 10
chickflick1066 Extra wide gaiters/long boots.. General 12
Sarah-B Where can we get extra long reins? General 5
K Mare being extra mareish! Horse Care 3
Star the Fell What did you do with your extra hour? Cafe 13
Star the Fell Extra hay in fields over Winter Horse Care 2
Ale Give your horses an extra hug tonight please. Cafe 9
LokiSofi Do cremellos need any extra care? Horse Care 5
Rubic Nearly 8 weeks on... A Rubic update *extra photos added* Cafe 28
Gattino Horse Search Update 14/07/13 Added Extra Pics Cafe 31
domane Potential Derby Winner... or carrying "a little extra"??? Cafe 12
Wally 4 extra teeth Veterinary,Injuries and Therapies 4
S Reward = extra try! Training of the Horse and Rider 4
ladywiththebaby Bucas rugs - are they worth the extra money? Horse Care 20
No_Angel Anyone got an extra £5000? Cafe 2
No_Angel I was extra brave today Confidence Club 8
D Extra bridesmaid and Usher ?? Cafe 3
ladyluxor Extra security as from today... Cafe 12
fairlady Extra checks tonight? Cafe 14
Fleabitten Grey Tendon Boots for Extra-large Legs? Tack & Saddlery 7
juliecwuk Solution saddles? are they worth the extra money? Tack & Saddlery 2
x.Moomoo.x Could do with an extra pair of hands? Cafe 30
G How to earn extra money or save what I've got... Cafe 15
Kimmy C How did YOU take advantage of the extra hour?? Cafe 21
H What extra would you..... Cafe 7
K What size are extra full size brow bands? Tack & Saddlery 8
V wintec extra wide gullet question... Tack & Saddlery 9
HorseBird ARGGHHHHH! Does anyone have a 16.5 extra wide synthetic saddle for sale?? Tack & Saddlery 4
never again Give me an idea of a new food for Aram please for extra ooomph! Metabolic 4
K extra full size grazing muzzles?? Horse Care 3
Fab filly Tips please - extra strong Chloe!!!! Training of the Horse and Rider 4
Mr Ed Ok to leave for an extra week? Hoof Care 4
team shane Extra Full Muzzles? Horse Care 4
H Extra lessons Training of the Horse and Rider 1
joey_olop Wintec Extra-Wide Gullet, White anyone?? Tack & Saddlery 1
Method_Acting Extra brakes for fast work? Tack & Saddlery 11
Rea Shires & Clydesdales - extra work, but worth it? Breeds, Colouring and Genetics 58
E Extra Calf Room Tried and Tested 1
Rarah Does she really need extra feed? Metabolic 4
eml Going that extra step Training of the Horse and Rider 12
S Extra large browbands Tack & Saddlery 10
V 24/7 turnout - what extra food? General 12
Fizz every day bridle in extra full? Tack & Saddlery 5
shikras mum extra full hunt breastplate? Tack & Saddlery 6
C extra big curb chain needed Tack & Saddlery 2
lizayr extra large show jackets/ body protectors General 2
BlueWicked the most horrific thing has happened - give all yours an extra hug tonight. General 25
M Extra Full or Full Bridle? Tack & Saddlery 6
F Will shoes last extra 4 weeks??? General 13
T DIY - extra services/assistance General 6

Similar threads

newrider.com